| previous | next |
![]() |
| City
of Brenham P.O. Box 1059 Brenham, Texas 77834-1059 Attn: Doug Baker, P.E. City Engineer 979-337-7594 City of Brenham Wastewater Cost of Service Study included evaluation of sludge digestion and disposal method and cost, including impact of future permit limits and requirements; evaluation of existing pretreatment monitoring and anticipated costs; evaluation of plant capacity (flow, BOD, TSS) with estimation of expansion needs based on historical data, projected growth and regulatory constraints; determination of unit costs for collection and treatment based on flow, BOD, TSS, toxicity and pretreatment requirements; method and annual cost of service evaluation per Citys pretreatment program requirements; identification and evaluation of costs associated with present inflow and infiltration and evaluation of collection system infrastructure requirements with annual cost estimates. PK Job No.: 00192-022 |
Back
to studies.
Back to project categories (infrastructure, subdivision
development, site development, studies, surveying).