previous next
City of Brenham
P.O. Box 1059
Brenham, Texas 77834-1059
Attn: Doug Baker, P.E.
City Engineer
979-337-7594


City of Brenham Wastewater Cost of Service Study included evaluation of sludge digestion and disposal method and cost, including impact of future permit limits and requirements; evaluation of existing pretreatment monitoring and anticipated costs; evaluation of plant capacity (flow, BOD, TSS) with estimation of expansion needs based on historical data, projected growth and regulatory constraints; determination of unit costs for collection and treatment based on flow, BOD, TSS, toxicity and pretreatment requirements; method and annual cost of service evaluation per City’s pretreatment program requirements; identification and evaluation of costs associated with present inflow and infiltration and evaluation of collection system infrastructure requirements with annual cost estimates.
PK Job No.: 00192-022

Back to studies.

Back to project categories (infrastructure, subdivision development, site development, studies, surveying).