| previous | next |
![]() |
| Centerline
W.S.C. Route 1, Box 123 Somerville, Texas 77879 Attn: Mr. Chester Nix 979-272-8270 Burleson County/Centerline W.S.C. 1999 TCDP Water System Improvements included a 75 GPM water well with a second well for backup and blending, CMU building, 32,000-gallon bolted ground storage tank, 3,000-gallon pressure tank, booster pumps, electrical/controls and yard piping and removing existing tanks. PK Job No.: 30499-012 Project Cost: $200,000 |
Back
to infrastructure projects.
Back to project categories (infrastructure, subdivision
development, site development, studies, surveying).