previous next
Centerline W.S.C.
Route 1, Box 123
Somerville, Texas 77879
Attn: Mr. Chester Nix
979-272-8270


Burleson County/Centerline W.S.C. 1999 TCDP Water System Improvements included a 75 GPM water well with a second well for backup and blending, CMU building, 32,000-gallon bolted ground storage tank, 3,000-gallon pressure tank, booster pumps, electrical/controls and yard piping and removing existing tanks.
PK Job No.: 30499-012
Project Cost: $200,000

Back to infrastructure projects.

Back to project categories (infrastructure, subdivision development, site development, studies, surveying).