previous next
Camp Allen
Episcopal Diocese of Texas Conference and Retreat Center
18800 F.M. 362
Navasota, Texas 77868
Attn: George Dehan
President
936-825-7175


Camp Allen 2002 Wastewater Improvements for the Pavilion and Camp Site 2 included 1,050 linear feet of 6-inch and 3,700 linear feet of 4-inch PVC sewer line, manholes and duplex submersible lift station with 5-foot diameter wet well.
PK Job No.: 20201-311
Project Cost: $93,000

Back to infrastructure projects.

Back to project categories (infrastructure, subdivision development, site development, studies, surveying).